Сonstruction of a small hydroelectric power plant (HPP) with an installed capacity of 0.5 MW at the Keldy Murat River hydroelectric complex in the Makanshy district of the Abay region
Сonstruction of a small hydroelectric power plant (HPP) with an installed capacity of 0.5 MW at the Keldy Murat River hydroelectric complex in the Makanshy district of the Abay region
The project provides for the construction of a small hydroelectric power plant (HPP) with an installed capacity of 0.5 MW at the Keldy Murat River hydroelectric complex in the Makanshy district of the Abay region. The maximum power generation capacity is 1,800,000 kWh.
- Indicator Results
- Investment amount, thousand US dollars 1 133
- NPV of the Project thousand, US dollars 460
- IRR, % 19
- EBITDA yield, %
- Payback period, years 12
- Discounted payback period, years - - 15,3