Construction of a small hydroelectric power plant (HPP) with an installed capacity of 1.0 MW on the Aksay main canal in the Zhualy district of the Zhambyl region
Construction of a small hydroelectric power plant (HPP) with an installed capacity of 1.0 MW on the Aksay main canal in the Zhualy district of the Zhambyl region
The project envisages the construction of a small hydroelectric power plant (HPP) with an installed capacity of 1.0 MW on the Aksay main canal in the Zhualy district of the Zhambyl region. The maximum power generation capacity is 3,600,000 kWh.
- Indicator Results
- Investment amount, thousand US dollars 1 133
- NPV of the Project thousand, US dollars 460
- IRR, % 19
- EBITDA yield, %
- Payback period, years 10
- Discounted payback period, years - - 15,3