Investment Projects

Region:

Industry:

Select a view:

Mirror Production

Mirror Production

Mirror Production

Establishment of glass mirror production in Astana with export potential. (OKED: 23.12 “Shaping and processing of flat glass”).

  • Indicator Results
  • Investment amount, thousand US dollars
  • NPV of the Project thousand, US dollars
  • IRR, %
  • EBITDA yield, %
  • Payback period, years
  • Discounted payback period, years - -

Read more

Plastic Waste Recycling

Plastic Waste Recycling

Plastic Waste Recycling

Establishment of road surface production in Astana (NACE Code: 38.32.3 “Recycling of non-metal waste, including processing (cleaning, melting, grinding) of plastic or rubber waste into granules”)

  • Indicator Results
  • Investment amount, thousand US dollars
  • NPV of the Project thousand, US dollars
  • IRR, %
  • EBITDA yield, %
  • Payback period, years
  • Discounted payback period, years - -

Read more

Production of Dishwashers

Production of Dishwashers

Production of Dishwashers

Establishment of dishwasher production in Astana. (NACE Code: 27.51 "Manufacture of electrical household appliances").

  • Indicator Results
  • Investment amount, thousand US dollars
  • NPV of the Project thousand, US dollars
  • IRR, %
  • EBITDA yield, %
  • Payback period, years
  • Discounted payback period, years - -

Read more

Aktau Resort

Aktau Resort

Aktau Resort

The state plans to invest more than $100 million in the development of supporting infrastructure at major points of attraction, as well as offer tax incentives and full support to private investors

  • Indicator Results
  • Investment amount, thousand US dollars
  • NPV of the Project thousand, US dollars
  • IRR, %
  • EBITDA yield, %
  • Payback period, years
  • Discounted payback period, years - -

Read more

Arlan Recreation Base on the Coast of the Bukhtarma Reservoir, East Kazakhstan Region

Arlan Recreation Base on the Coast of the Bukhtarma Reservoir, East Kazakhstan Region

Arlan Recreation Base on the Coast of the Bukhtarma Reservoir, East Kazakhstan Region

24 residential modules, glamping, bath complex, beach, summer terraces, recreation areas, children’s and sports infrastructure

  • Indicator Results
  • Investment amount, thousand US dollars 1 021
  • NPV of the Project thousand, US dollars 1 200
  • IRR, % 14,9
  • EBITDA yield, %
  • Payback period, years 6,5
  • Discounted payback period, years - - 8,5

Read more

Sale of iron ore deposits — Sholaksandyk

Sale of iron ore deposits — Sholaksandyk

Sale of iron ore deposits — Sholaksandyk

Sholaksandyk Iron Ore Deposit — Investment Opportunity.

  • Indicator Results
  • Investment amount, thousand US dollars
  • NPV of the Project thousand, US dollars
  • IRR, %
  • EBITDA yield, %
  • Payback period, years
  • Discounted payback period, years - -

Read more

Sale of iron ore deposits — Taldysay

Sale of iron ore deposits — Taldysay

Sale of iron ore deposits — Taldysay

TALDYSAY Iron Ore Deposit — Investment Proposal for Sale.

  • Indicator Results
  • Investment amount, thousand US dollars
  • NPV of the Project thousand, US dollars
  • IRR, %
  • EBITDA yield, %
  • Payback period, years
  • Discounted payback period, years - -

Read more

Virtual Assistant “Aigul” – AI and VR Platform for Staff Training and Assessment

Virtual Assistant “Aigul” – AI and VR Platform for Staff Training and Assessment

Virtual Assistant “Aigul” – AI and VR Platform for Staff Training and Assessment

“Aigul” is a digital employee developed using generative AI technologies, virtual reality, and voice analytics (LVA). The project addresses corporate training, recruitment, and personnel assessment. The product is actively used in retail, industry, banking, and the public sector.

  • Indicator Results
  • Investment amount, thousand US dollars 650 000
  • NPV of the Project thousand, US dollars
  • IRR, %
  • EBITDA yield, %
  • Payback period, years
  • Discounted payback period, years - -

Read more

Construction of a Gas Processing Plant in the Aktobe Region

Construction of a Gas Processing Plant in the Aktobe Region

Construction of a Gas Processing Plant in the Aktobe Region

The project targets the processing of gas with high concentrations of hydrogen sulfide and mercaptan. The planned processing depth is at least 95%.

  • Indicator Results
  • Investment amount, thousand US dollars 400 000-600 000
  • NPV of the Project thousand, US dollars
  • IRR, %
  • EBITDA yield, %
  • Payback period, years
  • Discounted payback period, years - -

Read more

Сonstruction of a small hydroelectric power plant (HPP) with an installed capacity of 1.0 MW on the Big Keles Main Canal in the Kazygurt district of the Turkestan region

Сonstruction of a small hydroelectric power plant (HPP) with an installed capacity of 1.0 MW on the Big Keles Main Canal in the Kazygurt district of the Turkestan region

Сonstruction of a small hydroelectric power plant (HPP) with an installed capacity of 1.0 MW on the Big Keles Main Canal in the Kazygurt district of the Turkestan region

The project provides for the construction of a small hydroelectric power plant (HPP) with an installed capacity of 1.0 MW on the Big Keles Main Canal in the Kazygurt district of the Turkestan region. The maximum power generation capacity is 8,640,000 kWh.

  • Indicator Results
  • Investment amount, thousand US dollars 1 133
  • NPV of the Project thousand, US dollars 460
  • IRR, % 19
  • EBITDA yield, %
  • Payback period, years 10
  • Discounted payback period, years - - 15,3

Read more

Install the application:
1) Open the website in Safari
2) Click save
3) Add to home screen