Investment Projects

Сonstruction of a small hydroelectric power plant (HPP) with an installed capacity of 0.5 MW at the Keldy Murat River hydroelectric complex in the Makanshy district of the Abay region

  • Indicator Results
  • Investment amount, thousand US dollars 1 133
  • NPV of the Project thousand, US dollars 460
  • IRR, % 19
  • EBITDA yield, %
  • Payback period, years 12
  • Discounted payback period, years - - 15,3

  • Name of the structure – Hydroelectric complex on the Keldy Murat River;
  • Location – Abay region, Makanshy district;
  • Water management basin – Balkhash Alakol basin;
  • Cadastral number – 05-248-052-042;
  • Purpose of the structure – seasonal irrigation;
  • Technical condition – satisfactory;
  • Water source – Keldy Murat Riverr;
  • Type of regulation – seasonal (May-September);
  • Annual discharge volume 9,864.5 thousand m3
  • Drop 17 meters.

The project provides for the construction of a small hydroelectric power plant (HPP) with an installed capacity of 0.5 MW at the Keldy Murat River hydroelectric complex in the Makanshy district of the Abay region. The maximum power generation capacity is 1,800,000 kWh.

The initiator of the project is the RSE «Kazvodkhoz».

What is the appeal of the project?

  • Environmental safety. Electricity generation at a hydroelectric power plant significantly reduces the amount of harmful emissions into the environment with minimal water consumption, and the used water is discharged into the river through the flow part of the turbine.
  • Reliability of the raw material base. The raw material for electricity production is the water flow of the Keldy Murat River. The level of precipitation in the river catchment area is relatively stable, and the risk of reducing the river flow is assessed as minimal.
  • State support. The renewable energy sources sector (RES) is actively supported by the state. Today, RES sector enterprises are exempt from paying for electricity transmission services, they are provided with predictable and long-term tariffs and a guaranteed purchase of all generated electricity.

Return back
Install the application:
1) Open the website in Safari
2) Click save
3) Add to home screen