Investment Projects

Construction of a small hydroelectric power plant (HPP) with an installed capacity of 1.0 MW at PK 87+96 on the Big Almaty Canal in the Enbekshikazakh district of Almaty region

  • Indicator Results
  • Investment amount, thousand US dollars 1 133
  • NPV of the Project thousand, US dollars 460
  • IRR, % 19
  • EBITDA yield, %
  • Payback period, years 12
  • Discounted payback period, years - - 15,3

  • Name of the structure – Big Almaty Canal HPP on PK 87+96;
  • Location – Enbekshikazakh district, Almaty region;
  • Water management basin – Balkhash Alakol basin;
  • Cadastral number – 03-044-279-588. Resolution of the Akim of Enbekshikazakh district, Almaty region № 434, dated April 21, 2016;
  • Purpose of the structure – regulated for seasonal irrigation, irrigated area 33.3 thousand ha;
  • Technical condition – satisfactory;
  • Water source – Shelek River (Bartogay reservoir);
  • Type of regulation – seasonal, from April to September;
  • Volume – (hydraulic performance - 75 m3/s; length - 100 meters;
  • Drop – 40 meters.

The project provides for the construction of a small hydroelectric power plant (HPP) with an installed capacity of 1.0 MW at PK 87+96 on the Big Almaty Canal in the Enbekshikazakh district of Almaty region. The maximum power generation capacity is 4,320,000 kWh.

The initiator of the project is the RSE «Kazvodkhoz».

What is the appeal of the project?

  • Environmental safety. Electricity generation at a hydroelectric power plant significantly reduces the amount of harmful emissions into the environment with minimal water consumption, and the used water is discharged into the river through the flow part of the turbine.
  • Reliability of the raw material base. The raw material for electricity production is the water flow of the Shelek River. The level of precipitation in the river catchment area is relatively stable, and the risk of reducing the river flow is assessed as minimal.
  • State support. The renewable energy sources sector (RES) is actively supported by the state. Today, RES sector enterprises are exempt from paying for electricity transmission services, they are provided with predictable and long-term tariffs and a guaranteed purchase of all generated electricity.