Construction of the Bartogay HPP-28 on the Shelek River, Almaty Region, Enbekshikazakh District

  • Indicator Results
  • Investment amount, thousand US dollars 2 951
  • NPV of the Project thousand, US dollars 964
  • IRR, % 28
  • EBITDA yield, %
  • Payback period, years 9,64
  • Discounted payback period, years - - 14,71

  • Name of the structure - Bartogay HPP-28 on the Shelek River
  • Location - located in the Enbekshikazakh district, Almaty Region, 175 km from Almaty, 55 km from the village of Shelek, 17 km from the village of Kokpek and the Almaty-Khorgos highway. (It is attached to the existing Bartogay Reservoir).
  • Water management basin – Balkhash Alakol basin
  • Cadastral number - 03-044-295-649
  • Purpose of the structure - adjustable for seasonal irrigation, irrigated area - ​​66.3 thousand ha
  • Technical condition - satisfactory
  • Water source - Shelek River
  • Type of regulation – seasonal, from April to September
  • Volume – NWL - 292.0 million m3, DVL- 48.0 million m3
  • Annual discharge volume (for 2023) - 951.54 million m3
  • Drop - 28 meters

The project envisages the construction of a small hydroelectric power plant (HPP) with an installed capacity of 3.3 MW on the Bartogay reservoir in the Enbekshikazakh district of the Almaty region. The maximum power generation capacity is 14,256,000 kWh.

The initiator of the project is the RSE «Kazvodkhoz».

What is the appeal of the project?

  • Environmental safety. Hydroelectric power generation significantly reduces the amount of harmful emissions into the environment with minimal water consumption, and the used water is discharged into the river through the turbine flow path.
  • Reliability of the raw material base. The raw material for electricity generation is the water flow of the Nura River. The level of precipitation in the river catchment area is relatively stable, and the risk of a decrease in the river flow is estimated as minimal.
  • State support. The renewable energy sources sector (RES) is actively supported by the state. Today, RES sector enterprises are exempt from paying for electricity transmission services, they are provided with predictable and long-term tariffs and a guaranteed purchase of all generated electricity.